1. Scope and Purpose
This manual covers the Lockout/Tagout (LOTO) procedure for safe energy isolation of machinery and equipment at UNITEC-D GmbH industrial facilities. It is intended for use by technical personnel during maintenance, repair, debugging, or cleaning operations where unexpected equipment start-up, release of stored energy, or movement of components could result in injury. Application of this procedure is mandatory for any work that requires access to hazardous areas or interaction with energy-carrying parts of equipment. Compliance with LOTO procedures meets the requirements of DSTU EN 1037:2018 and ISO 14118:2017 standards.
2. Precautions
DANGER: Failure to follow Lockout/Tagout procedures can result in serious injury or death. Always assume all power sources are active until their isolation is confirmed.
- Lockout/Tagout (LOTO): A complete LOTO procedure must be performed prior to any work on equipment that may unexpectedly start, move, or release stored energy. This includes identification, isolation, blocking, tagging and verification of the absence of energy.
- Personal protective equipment (PPE):
- Safety glasses or shield (according to DSTU EN 166:2017)
- Protective gloves (according to DSTU EN 388:2017 for mechanical risks, or DSTU EN 60903:2017 for electrical work)
- Safety shoes with a metal toe cap (according to DSTU EN ISO 20345:2019)
- Protective helmet (according to DSTU EN 397:2017)
- Protective clothing (special clothing that meets the working conditions)
- Dangerous energy:
- Electrical: Discharging capacitors, disconnecting from the network, locking switches. Always check the absence of voltage with a multimeter with the appropriate safety class (e.g. CAT III 1000V / CAT IV 600V) certified by UkrSEPRO.
- Mechanical: Springs, lifted loads, rotating components. Use mechanical supports, latches, wedge locking devices.
- Hydraulic/Pneumatic: Pressure in pipelines, cylinders. Pressure injection, blocking of valves, checking of manometers.
- Chemical: Substance residues in pipelines. Washing, neutralization, ventilation.
- Thermal: Hot surfaces, liquids, gases. Cooling, thermal insulation.
- Notification: Be sure to inform all employees who may be involved or affected about the LOTO procedure before it begins and after it is completed.
3. Necessary Tools and Materials
| Name of Tool/Material | Specification | Quantity |
|---|---|---|
| Personal LOTO lock | With unique key, corrosion resistant, dielectric housing | 1 for each employee |
| LOTO ID Tag | Laminated, with fields for date, name, reason. Corresponds to DSTU EN 14118:2017 | 1 per energy source |
| Multi-level blocker (hasp) | Steel or aluminum, for 6+ locks, hole diameter >8 mm | As needed |
| Blocker for electric machines | Appropriate size for a specific type of circuit breaker, universal | As needed |
| Blocker for ball/sliding valves | Appropriate diameter and type of faucet (for example, for faucets DN15-DN50) | As needed |
| Blocker for pneumatic connections | For standard quick disconnect couplings 1/4" - 1/2" | As needed |
| Voltmeter/Multimeter | DSTU EN 61010-1:2014, CAT III 1000V / CAT IV 600V, true RMS, with CE and UkrSEPRO | 1 |
| Infrared thermometer | Range -50°C to 500°C, accuracy ±1.5°C, emission factor 0.95 (adjustable) | 1 |
| Control manometer | Range 0-16 bar, accuracy class 1.0, case diameter 63 mm | 1 |
| A set of dielectric screwdrivers | DSTU EN 60900:2017, insulation up to 1000V, slot type PH1, PH2, SL3.0, SL4.0 | 1 set |
| Specialized tools for removing panels | According to the type of equipment (e.g. hexes, socket wrenches) | As needed |
4. Checklist of Inspection Before Service (LOTO)
This checklist is mandatory to complete before using the LOTO procedure.
| Element | Verification | Acceptance/Rejection Criteria | Notes |
|---|---|---|---|
| Scheme of equipment and energy carriers | Availability of an up-to-date electrical/hydraulic/pneumatic/technological scheme. | The scheme is accessible, readable, corresponds to the current state of the equipment (edited not older than 6 months). | |
| Identification of all energy sources | Determination of electrical (220V, 380V), mechanical (springs, gravity), hydraulic (150 bar), pneumatic (6 bar), chemical (reagents), thermal (120°C) sources. | All sources are identified and marked (for example, by marking on the diagram). | |
| Availability and serviceability of LOTO devices | Visual inspection of locks, tags, blockers for integrity and functionality. | LOTO devices are intact, undamaged, without signs of corrosion, function properly, tags are sufficient (minimum 1 tag per lock). | Tags must be up-to-date (no smudged inscriptions, clear). |
| Availability of appropriate PPE | Checking the availability and condition of necessary PPE for specific work risks. | All PPE available, suitable for use, certified (CE, UkrSEPRO), meet the standards of DSTU. | PPE has not expired. Protective gloves must have an abrasion resistance level of at least 3 (according to DSTU EN 388). |
| Notification of personnel | Confirmation of notification of all interested parties about the nature and duration of works. | All operators, managers, related services have been informed (verbal confirmation or journal entry). | |
| Availability of a work permit | The presence of a signed admission order or other permission in accordance with internal procedures. | The permit is signed, contains a clear description of the works, responsible persons, start/end time, and a list of risks. |
5. Step-by-Step Blocking/Tag Procedure (LOTO)
Follow these steps to safely isolate your equipment.
-
Step 1: Preparation and Notification
- Identify equipment that needs maintenance. Use nameplates and stock numbers for accurate identification.
- Understand all energy sources and potential hazards associated with equipment using up-to-date electrical, hydraulic, pneumatic and process diagrams (P&IDs).
- Notify all workers who use the equipment or are in the risk area of the upcoming shutdown and the reason (for example, "scheduled maintenance on pump #3"). Mistake: Forgetting to notify the shift staff or employees of adjacent shops, which can lead to an unauthorized start.
-
Step 2: Stop the Equipment
- Follow the standard equipment shutdown procedure by referring to the manufacturer's (OEM) operating manual or your local operating manual.
- Ensure that all equipment functions are completely stopped and that there are no moving parts.
- Error: Stopping too quickly, which may damage equipment or prevent full discharge of stored energy. Always stop the equipment in the order provided by the technological process.
-
Step 3: Energy Isolation
- Electrical power:
- Turn off the main circuit breaker or circuit breaker supplying voltage to the equipment. It should be a visible break in the electrical circuit. If possible, remove the fuses or turn off the disconnector.
- Place the interlock on the electrical switch. Make sure the switch is locked in the OFF position. For multi-phase systems, ensure that all phases are isolated.
- Hydraulic/Pneumatic Power:
- Close the inlet and outlet valves for the hydraulic or pneumatic system. Use special blockers for valves.
- Completely depressurize the system by opening the exhaust valves or appropriate pressure relief devices. Check the manometer reading: the pressure should be 0 bar. Make sure that the hydraulic cylinders are not under pressure and cannot move freely.
- Lock the valves in the closed (or vented) position. If necessary, disconnect the pneumatic hoses and install plugs on the exposed ports.
- Mechanical energy:
- Ensure that all moving parts of the equipment (springs, flywheels, lifted loads, conveyor belts) are fixed using mechanical stops, wedges, locking pins or special devices.
- Ensure that all potential movement or falling of components is prevented, for example by mechanical supports for lifted loads.
- Heat energy:
- Close the supply valves of steam, hot water or process liquid.
- Open the drain valves to drain and cool the system to a safe temperature.
- Measure the surface temperature with an infrared thermometer. The temperature should be below 40°C for safe touch. For high-temperature systems, it is possible to use additional thermal insulation.
- Chemical energy:
- Close chemical supply valves and shut-off valves.
- Flush piping and containers in accordance with Material Safety Data Sheets (SDS).
- Ensure that no hazardous vapors are present, using gas analyzers as necessary. Install plugs on the pipelines.
- Electrical power:
-
Step 4: Application of LOTO devices
- At each point of energy isolation (switch, valve, connector), install the appropriate blocker.
- Attach your personal lock to the blocker. Each employee who works on the equipment must install his own personal lock. Use a multi-level lock (hasp) if multiple people are working so that everyone can use their own lock.
- Attach an identification tag to each lock. On the tag, clearly indicate: your name (or identification number), the current date and time of blocking, the expected duration of work and the reason for blocking. Error: Unclear or missing tag completion, which can lead to confusion and dangerous situations.
-
Step 5: Verification of No Power
- This is a critical security step. DO NOT miss it.
- Make sure all workers are a safe distance from the equipment, outside the danger zone.
- Electrical Energy:
- Using a calibrated voltmeter that has been tested before use on a known voltage source, check that there is no voltage (0V) at all electrical terminals and components where energy may be present. The test should be performed phase-to-phase and phase-to-earth. A voltage check must be performed for each phase.
- Press the "START" button or try to activate the equipment (for example, through the control panel). Make sure the hardware is not starting up. This check should be performed only AFTER confirming the absence of voltage! Do not press the "START" button without first checking with a voltmeter.
- Hydraulic/Pneumatic Power:
- Check pressure gauges in the system. They should show 0 bar.
- Try briefly activating hydraulic/pneumatic cylinders or actuators (if possible without risk) to confirm no pressure and no movement.
- Mechanical Energy: Visually verify that all moving parts are locked and cannot move. Try to manually move them to confirm a secure fit.
- Heat Energy: Re-measure the temperature with the infrared thermometer. Make sure all surfaces are safe to touch (< 40°C).
- If any energy is detected, immediately return to Step 3 and check all isolation points and methods of discharging stored energy.
Step 6: Performing Maintenance Work
- After successfully verifying the absence of power, personnel can safely perform scheduled work.
- Follow all other safety procedures (e.g. working at height, working in confined spaces) and use appropriate tools, including torque wrenches, to tighten fasteners to the required torque (e.g. 45 Nm for M10 grade 8.8 bolts).
- Error: Removing LOTO devices before work is complete or before all tools are removed from the work area.
-
Step 7: Hardware Recovery
- Before removing LOTO devices, ensure that:
- All tools and equipment are removed from the work area and returned to storage.
- All guards and guards are in place and securely locked.
- All workers moved to a safe distance from the equipment.
- The equipment is visually ready to start, all components are assembled correctly.
- Notify all workers of the upcoming power restoration and possible equipment start-up.
- Each worker personally removes his lock and tag. The multi-level blocker is removed last after all personal locks have been removed. Error: One person picks the locks of others, which violates the principle of personal responsibility and is a gross breach of security.
- Restore power to the equipment by reversing the isolation steps (eg, open valves, turn on circuit breakers).
- Test equipment to make sure it is working properly by observing operating parameters (pressure, temperature, vibration, electrical characteristics).
- Before removing LOTO devices, ensure that:
6. After Service Verification Checklist (LOTO)
| Test/Check | Expected Result | Actual Result | Pass/Fail |
|---|---|---|---|
| Checking the availability of all tools | All tools are removed from the work area and accounted for. | ||
| Installation of protective covers/fences | All casings and fences are installed and fixed in accordance with DSTU EN ISO 14120:2019. | ||
| Lack of personnel in the danger zone | The working area is completely free of personnel and foreign objects. | ||
| Power recovery notification | All interested parties are notified of the equipment's readiness for launch. | ||
| Removal of LOTO devices | Each employee personally removed their lock/tag, the person in charge of LOTO checked the removal of all devices. | ||
| Visual inspection of the equipment | Absence of visible malfunctions, leaks, loose wires, insulation damage. | ||
| Test run of the equipment | The equipment starts up and functions according to the manufacturer's specifications. | ||
| Checking the operating parameters | Pressure (for example, 8 bar), temperature (for example, 75°C), voltage (for example, 380V), current (corresponding to the nominal value) are within normal limits. |
7. LOTO Troubleshooting Guide
| Symptom | Probable Cause | Corrective Action |
|---|---|---|
| Unable to block power source (switch, valve) | Malfunction of the switch/valve mechanism. Defective or inappropriate LOTO blocker. Incorrectly selected blocker type for a specific device. | Stop the blocking attempt immediately. Notify management and safety engineer. Use an alternative method of isolation (if safe and provided by procedure). Replace the blocker or repair the switch/valve. Modify the LOTO instruction if the blocker does not fit. |
| Residual energy detected after blocking (eg pressure > 0 bar, voltage > 0 V) | Not all energy sources are identified. The accumulated energy was not completely discharged. Malfunction of the isolation device (for example, valve leakage). Incorrect sequence of energy discharge. | Immediately stop all work and move to a safe distance. Recheck all potential power sources on the equipment diagram. Perform a complete discharge of accumulated energy. Check the integrity of LOTO devices and their effectiveness. If necessary, contact the equipment manufacturer. |
| The LOTO tag is missing or unreadable | Carelessness in filling/fixing. Tag damage due to external factors. Use of low-quality labels. | Stop work immediately. Install a new, clearly completed tag. Notify the violation of the procedure and conduct additional staff training. Ensure the use of durable, laminated tags. |
| The lock does not open/close | Damage to the lock (mechanical damage, corrosion). Jamming of the mechanism. Invalid key. | Do not attempt to pick the lock. Call the person responsible for LOTO or management to resolve the situation. Apply a formal emergency lock removal procedure that involves documentation and the presence of multiple responsible persons. |
| The equipment does not start after removing LOTO | Not all LOTO devices are removed. Not all isolation points are restored (valves are closed, switches are off). Equipment failure that occurred during service. | Check that all locks and tags have been removed. Check that all valves are open, switches are on, disconnectors are closed. Carry out equipment diagnostics according to the manufacturer's manual. If the cause is unknown, re-apply LOTO and perform a detailed examination. |
8. Recommended Maintenance Schedule of LOTO-Devices
Regular inspection and maintenance of LOTO devices is critical for their reliability and efficiency. Follow the schedule below.
| Task | Periodicity | Estimated Duration | Qualification Level |
|---|---|---|---|
| Visual inspection of personal locks and tags | Before each use | 1 minute | Operator/Technician |
| Visual inspection of group blockers (hasps) and specialized blockers (electric, valve) | Monthly (warehouse stocks), Before each use (issued with a permit) | 5 minutes | Technician |
| Checking the mechanical integrity and functionality of LOTO devices | Quarterly. It includes checking the locking mechanisms, the integrity of the case, and the readability of the markings. | 15 minutes per set | Technician |
| Training and recertification of LOTO personnel | Annually, or when changing procedures/equipment, or after an incident. | 4 hours (theory + practice) | Security Manager/TV Engineer |
| Audit of the LOTO procedure at the facility | Annually, or after significant changes in equipment/processes. | 8 hours (coverage of all production areas) | TV Engineer/Head of Department/External Auditor |
| Calibration of LOTO control and measuring devices (voltmeters, manometers, thermometers) | Annually, in accordance with DSTU ISO/IEC 17025:2019 | Depends on the number of devices | Metrologist/Service Center |
9. LOTO Spare Parts Directory
UNITEC-D GmbH offers a wide range of reliable LOTO devices that meet CE and UkrSEPRO standards. To order, please refer to our e-catalog at www.unitecd.com/e-catalog/.
| Description Details | Typical Specification | Category UNITEC |
|---|---|---|
| Padlock LOTO dielectric | Thermoplastic body, 38mm nylon bracket, UV resistance, unique key | Blocking means |
| LOTO metal padlock | Laminated steel body, 38mm hardened steel bracket, anti-corrosion, unique key | Blocking means |
| LOTO identification tag |