1. Content and purpose
This manual is intended for technicians and maintenance managers who maintain and repair centrifugal pumps in industrial installations. The purpose of this manual is to provide specific instructions for performing mechanical oil seal replacement, axle inspection, and output power curve testing. The textbook is made in the format of a practical guide for performing work on site.
2. Safety and precautions
Important: Before starting any work, turn off the electrical power and mechanical power, install the locking and marking seal, and then perform an electrical and mechanical shutdown.
Important: Use personal protective equipment (protective gloves, eyes, head protection). If chemical fluids are used, use additional protective measures.
Important: When working with liquid or high pressure, ensure that all components are hermetically sealed. Use shutdown and lockout to avoid accidents.
3. Necessary tools and materials
| Tool |
Specification |
Quantity |
| Wrench with nuts |
12–30 mm |
2 |
| Key with pins |
12–30 mm |
2 |
| Torque head |
10–25 Nm |
1 |
| Multimeter |
0–500 V |
1 |
| Laser for measurement |
0.01 mm |
1 |
| Means for cleaning |
Dry and wet cloth |
1 |
| Axle pads |
0.1–0.2 mm |
5 |
| Lubricating mastic |
Specialized for pumps |
1 |
4. Purposeful inspection
| Item |
Verification |
Acceptance/rejection criteria |
Notes |
| Electric power supply |
Off |
The shutdown is confirmed |
Confirm blocking and marking |
| Mechanical energy |
Off |
The shutdown is confirmed |
Confirm blocking and marking |
| Pump |
Immobile |
The shutdown is confirmed |
Check for no movement |
| Personal protective equipment |
Prepared |
Protective gloves, eyes, head |
Use at all stages |
| Cleansing |
done |
Absence of dust and liquids |
Use a dry and damp cloth |
5. Sequence of actions
- Unscrew the output axle nuts
- Use a 20-25 Nm wrench to unscrew the output axle nuts.
- Check that the axle is not detached.
- Error: Do not use excessive force, which can damage the sleeve.
- Remove the old mechanical seal
- Use a pin wrench to remove the old seal.
- Check if it is not left in the nest.
- Error: fluid may leak when removing the oil seal. Use protective equipment.
- Preparation for installing a new oil seal
- Install the new mechanical oil seal in the socket.
- Check if it is correctly installed.
- Error: Failure to install correctly may damage the sleeve.
- Installing the bushing
- Use a torque head to fix the bushing to 25 Nm.
- Check if the sleeve has not slipped.
- Error: Using the wrong force can cause the sleeve to deform.
- Installing the axle
- Install the axle in the pads using the laser to measure.
- Check if the axis does not deviate.
- Bug: Incorrect axle setup can lead to knocking out.
- Lubrication
- Use lubricating mastic on the axle.
- Check that the axis does not move.
- Error: Lack of lubrication can cause overheating.
- Reinstallation
- Use a wrench to install the output axle nuts.
- Check that the axle is not detached.
- Error: Using the wrong force can damage the sleeve.
- Testing
- Use a multimeter to test the electrical supply.
- Check if all elements are working.
- Error: Using the wrong power supply can cause malfunction.
6. Inspection after completion of work
| Test |
Expected result |
Actual result |
Pass/Fail |
| Electric power supply |
Off |
Off |
Pas |
| Mechanical energy |
Off |
Off |
Pas |
| Pump operation |
Stable |
Stable |
Pas |
| Fluid leakage |
Absent |
Absent |
Pas |
| No noise |
Absent |
Absent |
Pas |
7. Issue tracking
| Symptom |
Reasons |
Correction |
| Fluid leakage |
Incorrect installation of the oil seal |
Check the oil seal installation |
| Lack of electrical power |
Power off |
Check the power supply |
| Lack of mechanical energy |
Turning off mechanical energy |
Check the mechanical energy |
| Unstable operation of the pump |
Incorrect axle installation |
Check the axle setup |
| noise |
Improper lubrication |
Check the lubrication |
8. Recommended maintenance schedule
| Task |
Frequency |
Estimated time |
Skill level |
| Replacing the mechanical oil seal |
Annually |
2-3 hours |
Average |
| Checking the axis |
Annually |
1–2 hours |
Average |
| Testing the production capacity curve |
Annually |
2-3 hours |
Average |
| Cleansing |
monthly |
30–60 minutes |
Primary |
| Lubrication |
monthly |
30–60 minutes |
Primary |
9. Links to spare parts
| Part description |
Typical specification |
UNITEC-D category |
| Mechanical stuffing box |
Length 150 mm, diameter 50 mm |
12345 |
| Lining for axle |
Thickness 0.1–0.2 mm |
12346 |
| Lubricating mastic |
Specialized for pumps |
12347 |
| Nuts for the output axle |
Material: stainless steel |
12348 |
| Screws for installing the stuffing box |
Material: stainless steel |
12349 |
For spare parts visit: https://www.unitecd.com/e-catalog/
10. Links
This textbook meets the following standards:
- DSTU 2503-99: Requirements for maintenance of industrial equipment
- EN 733: Standards for pumps
- ISO 9001: Quality management system
- CE: Protection of electrical equipment
- UkrSEPRO: State examination of electrical equipment
In addition, see the technical documents of the manufacturer and instructions for the pumps.